

Reputation track
Shubin Interstellar
MiningCombatReconlocation_onWorks out of Nyx · Pyro · Stanton·Contracts build your standing with them
- 0Neutral0 rep· 11 contracts
- 1Jr. Contractor800 rep· 20 contracts
- 2Contractor2,200 rep· 40 contracts
- 3Sr. Contractor5,800 rep· 36 contracts
- 4Veteran Contractor15,000 rep· 30 contracts
- 5Head Contractor38,000 rep· 15 contracts
- 6Elite Contractor95,250 rep
Ranks come from the mission data's own rank field, lined up with the standing ladder by position. It matches what players report for this giver's big rewards, but the game files don't state an unlock requirement outright — treat the pairing as a strong guide, not gospel.
Topping out takes 95,250 reputation — about 381 runs of the best-paying contract.
Every contract this giver offers. Sort by reputation to find the best single run, or by rep/hr to find the best evening — those are frequently not the same contract, and the fastest ladder on the track is often several rungs below the top. 25 of them carry no rank in the game data at all, which is everything we know about when they unlock.
| Type | |||||||
|---|---|---|---|---|---|---|---|
| Lrg. Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.9 | 35 |
| Lrg. Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 3.5 | 35 |
| Lrg. Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.7 | 35 |
| Lrg. Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 3.7 | 35 |
| Mjr. Purchase Order: Ship Mined OreHead Contractor | Ship MiningVerified | 5 | +250 | 46m | 326 | 4.6 | 35 |
| Mjr. Purchase Order: Ship Mined OreHead Contractor | Ship MiningVerified | 5 | +250 | 46m | 326 | 4.6 | 35 |
| Mjr. Purchase Order: Ship Mined OreHead Contractor | Ship MiningVerified | 5 | +250 | 46m | 326 | 4.7 | 35 |
| Mjr. Purchase Order: Ship Mined OreHead Contractor | Ship MiningVerified | 5 | +250 | 46m | 326 | 4.7 | 35 |
| Mjr. Purchase Order: Ship Mined OreHead Contractor | Ship MiningVerified | 5 | +250 | 46m | 326 | 4.7 | 35 |
| Mjr. Purchase Order: Ship Mined OreHead Contractor | Ship MiningVerified | 5 | +250 | 46m | 326 | 4.6 | 35 |
| Mjr. Purchase Order: Ship Mined OreHead Contractor | Ship MiningVerified | 5 | +250 | 46m | 326 | 4.7 | 35 |
| Mjr. Purchase Order: Ship Mined OreHead Contractor | Ship MiningVerified | 5 | +250 | 46m | 326 | 4.3 | 35 |
| Special Purchase Order: Mined MaterialsVeteran Contractor | Ship MiningVerified | 4 | +250 | 2.1h | 118 | 4.2 | 35 |
| Special Purchase Order: Mined MaterialsVeteran Contractor | Ship MiningVerified | 4 | +250 | 1.9h | 131 | 4.2 | 35 |
| Special Purchase Order: Mined MaterialsVeteran Contractor | Ship MiningVerified | 4 | +250 | 2.0h | 123 | 4.2 | 35 |
| Special Purchase Order: Mined MaterialsVeteran Contractor | Ship MiningVerified | 4 | +250 | 1.7h | 146 | 4.2 | 35 |
| Special Purchase Order: Mined MaterialsVeteran Contractor | Ship MiningVerified | 4 | +250 | 1.9h | 131 | 4.2 | 35 |
| Special Purchase Order: Mined MaterialsVeteran Contractor | Ship MiningVerified | 4 | +250 | 2.3h | 108 | 4.2 | 35 |
| Special Purchase Order: Mined MaterialsVeteran Contractor | Ship MiningVerified | 4 | +250 | 1.7h | 146 | 4.2 | 35 |
| Special Purchase Order: Mined MaterialsHead Contractor | Ship MiningVerified | 5 | +250 | 1m | 15,000 | 1 | — |
| Special Purchase Order: Mined MaterialsHead Contractor | Ship MiningVerified | 5 | +250 | 1m | 15,000 | 1 | — |
| Special Purchase Order: Mined MaterialsHead Contractor | Ship MiningVerified | 5 | +250 | 1m | 15,000 | 1 | — |
| Special Purchase Order: Mined MaterialsHead Contractor | Ship MiningVerified | 5 | +250 | 1m | 15,000 | 1 | — |
| Special Purchase Order: Mined MaterialsHead Contractor | Ship MiningVerified | 5 | +250 | 1m | 15,000 | 1 | — |
| Special Purchase Order: Mined MaterialsHead Contractor | Ship MiningVerified | 5 | +250 | 1m | 15,000 | 1 | — |
| Special Purchase Order: Mined MaterialsHead Contractor | Ship MiningVerified | 5 | +250 | 1m | 15,000 | 1 | — |
| XL Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +250 | 32m | 469 | 3.9 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.9 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 3.5 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 3.5 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.9 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 57m | 265 | 4 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.9 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 4 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 49m | 304 | 3.7 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 3.9 | 70 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.9 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 3.9 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.9 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.9 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.7 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 3.8 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.7 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 3.8 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 32m | 469 | 3.7 | 35 |
| XL Purchase Order: Ship Mined OreVeteran Contractor | Ship MiningVerified | 4 | +250 | 58m | 257 | 3.8 | 35 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 706 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 706 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 706 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 25m | 472 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 14m | 876 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 1.1h | 186 | 4 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 53m | 227 | 4 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 706 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 31m | 392 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 706 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 706 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 12m | 1,043 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 16m | 759 | 3.5 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 1.4h | 147 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 1.3h | 151 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 1.3h | 158 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 1.5h | 135 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 1.3h | 157 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 1.0h | 194 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 706 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 706 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 706 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 12m | 976 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 17m | 710 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 31m | 392 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 31m | 392 | 3.3 | 18 |
| Lrg. Purchase Order: Ship Mined OreSr. Contractor | Ship MiningVerified | 3 | +200 | 1.4h | 146 | 3.3 | 18 |
| Lrg. Purchase Order: Vehicle Mined OreSr. Contractor | Ground Vehicle MiningVerified | 3 | +200 | 23m | 522 | 3.4 | — |
| Lrg. Purchase Order: Vehicle Mined OreSr. Contractor | Ground Vehicle MiningVerified | 3 | +200 | 23m | 522 | 4.5 | — |
| Lrg. Purchase Order: Vehicle Mined OreSr. Contractor | Ground Vehicle MiningVerified | 3 | +200 | 23m | 522 | 3.8 | — |
| Med. Purchase Order: Vehicle Mined OreSr. Contractor | Ground Vehicle MiningVerified | 3 | +200 | 23m | 522 | 3 | — |
| Med. Purchase Order: Vehicle Mined OreSr. Contractor | Ground Vehicle MiningVerified | 3 | +200 | 23m | 522 | 4 | — |
| XL Purchase Order: Hand Mined MaterialsSr. Contractor | Hand MiningVerified | 3 | +200 | 42m | 283 | 4.5 | 7 |
| XL Purchase Order: Hand Mined MaterialsSr. Contractor | Hand MiningVerified | 3 | +200 | 43m | 281 | 3.8 | 7 |
| XL Purchase Order: Hand Mined MaterialsSr. Contractor | Hand MiningVerified | 3 | +200 | 27m | 438 | 4.2 | 6 |
| Lrg. Purchase Order: Hand Mined MaterialsContractor | Hand MiningVerified | 2 | +150 | 22m | 407 | 3.8 | 7 |
| Lrg. Purchase Order: Hand Mined MaterialsContractor | Hand MiningVerified | 2 | +150 | 14m | 643 | 3 | 6 |
| Lrg. Purchase Order: Hand Mined MaterialsContractor | Hand MiningVerified | 2 | +150 | 14m | 643 | 3 | 6 |
| Lrg. Purchase Order: Hand Mined MaterialsContractor | Hand MiningVerified | 2 | +150 | 14m | 641 | 3.3 | 6 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 10m | 891 | 3.2 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 10m | 891 | 3.2 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 26m | 342 | 3.7 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 10m | 865 | 3.2 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 10m | 918 | 3.2 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 12m | 726 | 3.7 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 9m | 1,011 | 3.2 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 12m | 783 | 3.2 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 20m | 446 | 3.7 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 6m | 1,579 | 3.7 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 9m | 968 | 3.7 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 17m | 542 | 3.2 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 17m | 529 | 3.2 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 49m | 183 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 11m | 833 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 20m | 455 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 29m | 311 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 60m | 150 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 51m | 176 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 26m | 342 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 11m | 811 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 10m | 865 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 10m | 947 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 25m | 360 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 12m | 732 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 21m | 421 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 28m | 324 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 17m | 529 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 17m | 529 | 3 | 18 |
| Med. Purchase Order: Ship Mined OreContractor | Ship MiningVerified | 2 | +150 | 31m | 294 | 3 | 18 |
| Med. Purchase Order: Vehicle Mined OreContractor | Ground Vehicle MiningVerified | 2 | +150 | 18m | 500 | 3.4 | — |
| Med. Purchase Order: Vehicle Mined OreContractor | Ground Vehicle MiningVerified | 2 | +150 | 18m | 500 | 4.5 | — |
| Med. Purchase Order: Vehicle Mined OreContractor | Ground Vehicle MiningVerified | 2 | +150 | 18m | 500 | 3.8 | — |
| Small Purchase Order: Vehicle Mined OreContractor | Ground Vehicle MiningVerified | 2 | +150 | 18m | 500 | 3 | — |
| Small Purchase Order: Vehicle Mined OreContractor | Ground Vehicle MiningVerified | 2 | +150 | 18m | 500 | 4 | — |
| Small Purchase Order: Vehicle Mined OreContractor | Ground Vehicle MiningVerified | 2 | +150 | 18m | 500 | 3.3 | — |
| Med. Purchase Order: Hand Mined MaterialsJr. Contractor | Hand MiningVerified | 1 | +100 | 10m | 600 | 3.4 | 7 |
| Med. Purchase Order: Hand Mined MaterialsJr. Contractor | Hand MiningVerified | 1 | +100 | 10m | 600 | 3 | 6 |
| Med. Purchase Order: Hand Mined MaterialsJr. Contractor | Hand MiningVerified | 1 | +100 | 10m | 600 | 3 | 6 |
| Med. Purchase Order: Hand Mined MaterialsJr. Contractor | Hand MiningVerified | 1 | +100 | 10m | 600 | 3.3 | 6 |
| Small Mining Order: SadaryxJr. Contractor | Hand MiningVerified | 1 | +100 | 15m | 392 | 3.3 | — |
| Small Purchase Order: Hand Mined MaterialsNeutral | Hand MiningVerified | 0 | +100 | 9m | 667 | 3.8 | 7 |
| Small Purchase Order: Hand Mined MaterialsNeutral | Hand MiningVerified | 0 | +100 | 9m | 667 | 3.3 | 6 |
| Small Purchase Order: Hand Mined MaterialsNeutral | Hand MiningVerified | 0 | +100 | 16m | 379 | 3.8 | 7 |
| Small Purchase Order: Hand Mined MaterialsNeutral | Hand MiningVerified | 0 | +100 | 16m | 379 | 3.3 | 6 |
| Small Purchase Order: Hand Mined MaterialsNeutral | Hand MiningVerified | 0 | +100 | 17m | 353 | 3.8 | 6 |
| Small Purchase Order: Ship Mined OreJr. Contractor | Ship MiningVerified | 1 | +100 | 13m | 472 | 3.2 | 15 |
| Small Purchase Order: Ship Mined OreJr. Contractor | Ship MiningVerified | 1 | +100 | 20m | 305 | 3.7 | 15 |
| Small Purchase Order: Ship Mined OreJr. Contractor | Ship MiningVerified | 1 | +100 | 21m | 284 | 3.2 | 15 |
| Small Purchase Order: Ship Mined OreJr. Contractor | Ship MiningVerified | 1 | +100 | 17m | 345 | 3.2 | 15 |
| Small Purchase Order: Ship Mined OreJr. Contractor | Ship MiningVerified | 1 | +100 | 25m | 241 | 3 | 15 |
| Small Purchase Order: Ship Mined OreJr. Contractor | Ship MiningVerified | 1 | +100 | 23m | 260 | 3 | 15 |
| Small Purchase Order: Ship Mined OreJr. Contractor | Ship MiningVerified | 1 | +100 | 18m | 337 | 3 | 15 |
| Small Purchase Order: Ship Mined OreJr. Contractor | Ship MiningVerified | 1 | +100 | 19m | 323 | 3 | 15 |
| Small Purchase Order: Vehicle Mined OreJr. Contractor | Ground Vehicle MiningVerified | 1 | +100 | 16m | 375 | 3.4 | — |
| Small Purchase Order: Vehicle Mined OreJr. Contractor | Ground Vehicle MiningVerified | 1 | +100 | 16m | 375 | 4.5 | — |
| Small Purchase Order: Vehicle Mined OreJr. Contractor | Ground Vehicle MiningVerified | 1 | +100 | 16m | 375 | 3.8 | — |
| Small Purchase Order: Vehicle Mined OreJr. Contractor | Ground Vehicle MiningVerified | 1 | +100 | 16m | 375 | 3 | — |
| Small Purchase Order: Vehicle Mined OreJr. Contractor | Ground Vehicle MiningVerified | 1 | +100 | 16m | 375 | 4 | — |
| Small Purchase Order: Vehicle Mined OreJr. Contractor | Ground Vehicle MiningVerified | 1 | +100 | 16m | 375 | 3.3 | — |
| Supply Order: Sadaryx Focus LensesJr. Contractor | Hand MiningVerified | 1 | +100 | 18m | 331 | 3.6 | — |
| XS Purchase Order: Ship Mined OreNeutral | Ship MiningVerified | 0 | +100 | 5m | 1,250 | 3.2 | 15 |
| XS Purchase Order: Ship Mined OreNeutral | Ship MiningVerified | 0 | +100 | 7m | 882 | 3 | 15 |
| XS Purchase Order: Ship Mined OreNeutral | Ship MiningVerified | 0 | +100 | — | — | — | 15 |
| XS Purchase Order: Ship Mined OreNeutral | Ship MiningVerified | 0 | +100 | 11m | 541 | 3 | 15 |
| XS Purchase Order: Ship Mined OreNeutral | Ship MiningVerified | 0 | +100 | 11m | 566 | 3 | 15 |
| XS Purchase Order: Ship Mined OreNeutral | Ship MiningVerified | 0 | +100 | 7m | 822 | 3 | 15 |
| Alliance Aid: Collect Manufacturing Resource - Large Scale | PriorityVerifiedEvent | — | — | 6.7h | — | 4.3 | — |
| Alliance Aid: Collect Manufacturing Resource - Large Scale | PriorityVerifiedEvent | — | — | 6.5h | — | 4.3 | — |
| Alliance Aid: Collect Manufacturing Resource - Medium Scale | PriorityVerifiedEvent | — | — | 2.5h | — | 4 | — |
| Alliance Aid: Collect Manufacturing Resource - Medium Scale | PriorityVerifiedEvent | — | — | 2.6h | — | 4 | — |
| Alliance Aid: Collect Manufacturing Resource - Small Scale | PriorityVerifiedEvent | — | — | 24m | — | 3.7 | — |
| Alliance Aid: Collect Manufacturing Resource - Small Scale | PriorityVerifiedEvent | — | — | 22m | — | 3.7 | — |
| Clear Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Expel Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Expel Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Expel Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Expel Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Oust Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Oust Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Oust Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Oust Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| PU Remove Claim Jumpers Stanton1 | MercenaryVerified | — | — | — | — | — | — |
| PU Remove Claim Jumpers Stanton2 | MercenaryVerified | — | — | — | — | — | — |
| PU Remove Claim Jumpers Stanton3 | MercenaryVerified | — | — | — | — | — | — |
| PU Remove Claim Jumpers Stanton4 | MercenaryVerified | — | — | — | — | — | — |
| QV Breaker Station Mining Rights (Exclusive) | Ship MiningVerified | — | — | 10m | — | — | 11 |
| QV Breaker Station Mining Rights (Shared) | Ship MiningVerified | — | — | 10m | — | — | 11 |
| Remove Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Remove Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Remove Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
| Remove Claimjumpers | MercenaryVerified | — | — | — | — | — | — |
A dash means the game defines no value for that contract — not that the value is zero — and those rows stay at the bottom whichever way you sort. Time is the contract generator's own budget rather than a measured run, so rep/hr derived from it ranks contracts well and should not be read as a stopwatch.
inventory_2Blueprints on this track
63 blueprints can drop from these contracts.
Arclight Pistol Battery (30 cap)126 contracts
Arbor MH1 Mining Laser96 contracts
BroadSpec96 contracts
BroadSpec96 contractsBroadSpec-Go96 contracts
BroadSpec-Max96 contracts
Helix I Mining Laser96 contracts
Hofstede-S1 Mining Laser96 contracts
Impact I Mining Laser96 contracts
Klein-S1 Mining Laser96 contracts
Lancet MH1 Mining Laser96 contracts
Pitman Mining Laser96 contracts
Arclight "Nightstalker" Pistol55 contracts
Arclight "Stormfall" Pistol55 contracts
Arclight "Warhawk" Pistol55 contracts
Arclight Pistol55 contracts
Aril Arms55 contracts
Aril Core55 contracts
Aril Helmet55 contracts
Aril Legs55 contracts
Horizon Helmet55 contracts
Venture Arms55 contracts
Venture Core55 contracts
Venture Legs55 contracts
Arbor MHV Mining Laser53 contracts
Lawson Mining Laser53 contracts
S0 Helix53 contracts
S00 Hofstede53 contracts
Surveyor53 contracts
Surveyor-Go53 contracts
Surveyor-Lite53 contracts
Surveyor-Max53 contracts
Arbor MH2 Mining Laser39 contracts
FullSpec39 contractsFullSpec-Go39 contracts
FullSpec-Max39 contracts
Helix II Mining Laser39 contractsHofstede-S2 Mining Laser39 contracts
Impact II Mining Laser39 contractsKlein-S2 Mining Laser39 contracts
Lancet MH2 Mining Laser39 contractsArclight "Midnight" Pistol10 contracts
Strata Arms10 contracts
Strata Core10 contracts
Strata Helmet Shooting Star10 contracts
Strata Legs10 contracts
Arclight "Desert Shadow" Pistol6 contracts
Arclight "Herrero" Pistol6 contracts
Novikov Exploration Suit6 contracts
Novikov Helmet6 contracts
Pembroke Exploration Suit6 contracts
Pembroke Helmet6 contractsMonde Arms Delta Camo2 contracts
Monde Arms Hemlock Camo2 contracts
Monde Core Delta Camo2 contracts
Monde Core Hemlock Camo2 contracts
Monde Helmet Delta Camo2 contracts
Monde Helmet Hemlock Camo2 contracts
Monde Legs Delta Camo2 contracts
Monde Legs Hemlock Camo2 contracts
R97 "Kismet" Shotgun2 contracts
R97 "Righteous" Shotgun2 contracts
R97 Shotgun Magazine (18 cap)2 contracts
Faction data from the self-hosted SC game-data mirror · patch 4.10.0-LIVE.12519617

